Project Scope
This operation involved the lifting and removal of an existing chiller unit and the installation of a new chiller on a high-rise building. Detailed planning was carried out to address load calculations, crane positioning, and site access constraints typical of skyscraper environments.
The old chiller was carefully disconnected, rigged, and lifted out using appropriate crane capacity and lifting gear, ensuring no disruption to surrounding structures or services. The new chiller unit was then hoisted and accurately positioned at the designated location, followed by precise alignment for installation.
All activities were executed with strict adherence to safety standards, coordinated lifting procedures, and effective communication among teams to ensure a smooth, damage-free replacement process in a complex high-elevation setting.
LAGOS
Lifting & Skidding
Build, streamline and evolve together with solution
- Prepare Documentation
- Brand Consistency
- Quality Control System
- Organise everything early thoroughly
- Highest Standards in Cost Control