CHILLER REPLACEMENT ON HIGH-RISE BUILDING

CHILLER REPLACEMENT ON HIGH-RISE BUILDING

Completion Date

2024

Project Scope

This operation involved the lifting and removal of an existing chiller unit and the installation of a new chiller on a high-rise building. Detailed planning was carried out to address load calculations, crane positioning, and site access constraints typical of skyscraper environments.

The old chiller was carefully disconnected, rigged, and lifted out using appropriate crane capacity and lifting gear, ensuring no disruption to surrounding structures or services. The new chiller unit was then hoisted and accurately positioned at the designated location, followed by precise alignment for installation.

All activities were executed with strict adherence to safety standards, coordinated lifting procedures, and effective communication among teams to ensure a smooth, damage-free replacement process in a complex high-elevation setting.

Location

LAGOS

Category

Lifting & Skidding

Budget
$16 Million

Build, streamline and evolve together with solution

Always ready to push the boundaries, especially when it comes to our own platform, Our analytical eye to create a site that was visually engaging and also optimised for maximum performance. It also perfectly reflects the journey to help it tell a story to increase its understanding and drive action. To create a site that was visually engaging for maximum performance.

The only Crane Hire you can trust.

234-707-452-8289

info@cranes-r-us.com

Plot 9 Eric Moore Road
Eric Moore Industrial Estate
Iganmu, Lagos, Nigeria.

Main Offices

Monday-Friday: 9am-5pm

Saturday: 9am-Midday

© CranesRus 2026, All Rights Reserved.