TRANSPORT FROM STORAGE AREA TO QUAYSIDE, ROLL ON TRANSPORT, BARGING FROM ONNE TO IKOT ABASI JETTY, ROLL OFF TRANSPORT AND STOOLING DOWN IN SITE STORAGE AREA
2025
Project Scope
This scope covered the end-to-end movement of cargo from the storage area to the final site storage location. It began with the transport of cargo from the storage yard to the quayside, followed by roll-on operations onto a barge using appropriate loading equipment.
Each cargo unit was then transported via barge from Onne to Ikot Abasi Jetty, with all marine logistics and securing measures properly managed to ensure stability during transit. Upon arrival, the operation continued with roll-off discharge from the barge, followed by onward transportation to the site storage area.
The final stage involved the careful positioning and stooling down of the cargo within the designated storage location. All activities are executed with strict adherence to safety standards, proper load securing, and coordinated logistics to ensure seamless and damage-free delivery.